Selected Works

Real infrastructure work delivered in demanding operating conditions.

These project highlights are drawn directly from the company profile and show the kind of railway and civil environments Neev Construction is built to handle.

Track Record

3 States

Operational project presence across Gujarat, Madhya Pradesh, and Maharashtra.

Track Record

Government and PSU Clients

Execution experience with railway and public-sector stakeholders.

Track Record

Rail, Metro, Civil

Focused delivery across transport infrastructure and heavy civil works.

Railway Infrastructure / Vadodara, Gujarat

MEMU Car Shed

Aerial view of the MEMU car shed facility and rail lines in Vadodara.

Overview

Modernization of a heavy repair facility in an active railway zone, delivered while preserving ongoing operations.

Client
Western Railway
Location
Vadodara, Gujarat
Contract value
Rs. 44 Cr

Scope Included

  • Modernization of a heavy repair facility in an active railway zone.
  • Extension of the 21m span shed while maintaining operational continuity.
  • Construction of a 540m new shed with pit line and catwalk system.
  • Development of allied infrastructure including DG room, overhead tank, and power house.

Key Outcome

Completed complex structural work in a live environment without disrupting railway operations.

Execution Summary

Delivered inside a live railway environment where continuity, access, and structural sequencing had to remain tightly controlled.

Railway Yard Development / Dahod-Indore Line

Pitol Yard Development

Railway yard and platform development works along the Dahod-Indore line.

Overview

New yard development combining loop lines, signaling, overhead electrification, and operational support infrastructure in remote terrain.

Client
Western Railway
Location
Dahod-Indore Line
Contract value
Rs. 81 Cr

Scope Included

  • Construction of a new railway yard with six loop lines.
  • Installation of signaling infrastructure and overhead electrification.
  • Development of staff quarters and operational buildings.
  • Execution in challenging remote terrain with limited accessibility.

Key Outcome

Delivered critical infrastructure three weeks ahead of schedule despite logistical challenges.

Execution Summary

A remote-site railway package where logistics, terrain, and program control were as important as the built scope itself.

Metro and Urban Rail / Maharashtra

Kalyan-Badlapur Line Project

Urban railway corridor with new track and platform infrastructure in Maharashtra.

Overview

Urban corridor extension work combining track alignment, pedestrian bridges, signaling systems, and utility relocation through dense city conditions.

Client
MRVC
Location
Maharashtra
Contract value
Rs. 110 Cr

Scope Included

  • Extension of a suburban railway line through a densely populated urban corridor.
  • Construction of a 3.5km new track alignment.
  • Building of two pedestrian overbridges in congested areas.
  • Installation of signaling and safety systems.
  • Relocation of utilities while maintaining urban services.

Key Outcome

Coordinated with 14 different civic agencies to execute work without major service disruptions in a dense urban environment.

Execution Summary

Executed through a dense metropolitan environment where multiple agencies, utility systems, and public movement had to remain coordinated.

Next Step

Need the full credentials pack or project discussion?

The website now reflects the available portfolio notes. Additional drawings, credentials, and higher-resolution project documentation can be shared directly.

Contact Neev